Pretoria Portland Cement (PPC) - Slurry Devision
Flow Software Implementation Project
Darner Engineering was tasked to determine PPC Slurry's efficiency using Flow-Software.
The project consists of :
- Collaborating with PPC and determining KPI's
- Engineering Flow-Software based on required KPI's
- Implementing the engineered Flow-Software
- Engineering Flow-Software forms
- Deploying Flow Information Platform including emailing reports to stake holders
Finishing Mills 1 - 4 Software Upgrade Project
Darner Engineering was tasked to convert the existing four Finishing Mills control software from Step 7 with Adroit to PCS 7 with Cemat.
This includes :
- Pre-Engineering
- I/O Lists
- PLC and SCADA Engineering on PCS7 with Cemat
- Factory Acceptance Test
- Cold Commissioning
- Hot Commissioning
- Optimization
- Hand-Over
Quarry Software Upgrade Project
Darner Engineering was tasked to convert the software running the Quarry and Crushers control software from Step 7 with Wonderware to PCS 7 with Cemat.
This includes :
- Pre-Engineering
- I/O Lists
- PLC and SCADA Engineering on PCS7 with Cemat
- Factory Acceptance Test
- Cold Commissioning
- Hot Commissioning
- Optimization
- Hand-Over
Kiln 8 Bag Filter and Water Injection Software Project
Darner Engineering was tasked to engineering a control solution for the newly Installed Kiln 8 Bag Filter with Water Injection utilizing PCS 7 with Cemat. The project included removing the existing Electro Filter and replacing it with a new Bag Filter and Water Injection unit.
This includes :
- Pre-Engineering
- I/O Lists
- PLC and SCADA Engineering on PCS7 with Cemat
- Factory Acceptance Test
- Cold Commissioning
- Hot Commissioning
- Optimization
- Hand-Over
Clinker Load Out Road and Rail Software Project
Darner Engineering was tasked to engineering a control solution for the newly Installed Clinker Road and Rail load out system. The system interfaces with third-party software (Weighware) as well as controlling the rail locomotive to load the clinker wagons remotely.
This includes :
- Pre-Engineering
- I/O Lists
- PLC and SCADA Engineering on PCS7 with Cemat
- Factory Acceptance Test
- Cold Commissioning
- Hot Commissioning
- Optimization
- Hand-Over